Boom Extension Cylinder - Genie S-80 Service Manual

Hide thumbs Also See for S-80:
Table of Contents

Advertisement

Service Manual
Boom Components
4-4

Boom Extension Cylinder

The boom extension cylinder is located inside the
boom assembly and incorporates cables and
pulleys that are responsible for extending the
number 3 boom tube. The primary boom extension
cylinder is equipped with counterbalance valves to
prevent movement in the event of a hydraulic line
failure.
How to Remove the Boom
Extension Cylinder
Bodily injury hazard. This
procedure requires specific repair
skills, lifting equipment and a
suitable workshop. Attempting
this procedure without these skills
and tools could result in death or
serious injury and significant
component damage. Dealer
service is strongly recommended.
Note: When removing a hose assembly or fitting,
the O-ring (if equipped) on the fitting and/or hose
end must be replaced. All connections must be
torqued to specification during installation. Refer to
Specifications, Hydraulic Hose and Fitting Torque
Specifications.
Note: Perform this procedure with the boom fully
retracted.
1
Raise the boom to a horizontal position.
2
Remove the boom end cover retaining
fasteners and remove the cover.
3
Remove the access covers from both sides of
the boom at the pivot end.
100
4
Fully loosen the lock nuts on the extend
cables. Do not remove the nuts.
1 cable guard
2 retaining block
5
Loosen the retract cable nut at the platform
end of the boom. Pull the cable rod from the
support and let it hang down.
6
Remove the cable guard fasteners and
remove the cable guard.
7
Locate the retaining plates that secure the
retract cables to the inside of the number 3
boom tube.
8
Remove the cable retaining plates and pull the
retract cables off of the pulleys. Lay the cables
flat and out of the way.
S-80 • S-85 • S-80X
February 2017
Part No. 1259369GT

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

S-85S-80x

Table of Contents