Installation
Installing the power supply
4.8.2

On the HiPath 1150

Installation Procedures
Step
1.
Check network voltage
2.
Install the ferrite (C39022-Z7000-C7) in the AC power cable of the PSU at most 20
mm from the female connector (see Figure 4-35 on page 4-165).
3.
If the voltage is within the power supply's voltage range, connect the power supply.
4.
If the power supply has a battery input socket (BBU) or if you have acquired the BBU
extension kit (S30817-H853-B401-*), please connect them as indicated in
"Installing the batteries" on page 4-169.
5.
"Performing a visual inspection" on page 4-189
6.
Configure the required data (see "Operation" on page 7-278).
Warning
!
Use the cable of the power supply to turn system power on or off. If batteries are
installed, they should also be turned on or off.
Figure 4-33
Installing the PSU HiPath 1150
4-164
Procedure
Power supply
Service Manual