Examples Of Configurations X Capacities X Times; Main Distribution Frame; Table 3-36 Examples Of The Working Period Of The Batteries In The Hipath 1150; Table 3-37 Examples Of The Working Period Of The Batteries In The Hipath 1190 - Siemens HiPath 1100 Service Manual

Hide thumbs Also See for HiPath 1100:
Table of Contents

Advertisement

Modules

Main Distribution Frame

3.8.1

Examples of Configurations X Capacities x Times

As an example, a simulation was carried out in some of the settings of the HiPath 1150/1190
systems for the working period of the system when there is in an outage in the AC network
under normal call traffic conditions.
HiPath 1150
Settings
01 MB
01 MB + 01TME1
01 MB + 01 EB 210
Table 3-36
Examples of the working period of the batteries in the HiPath 1150
Increasing by one EB 210 module reduces the total time by 15 minutes.
HiPath 1190
Settings
01 CPU + 01 EB 210
01 CPU + 01 EB 210 + 01TME1
01 CPU + 02 EB 210 + 02TME1
Table 3-37
Examples of the working period of the batteries in the HiPath 1190
Increasing by one EB 210 module reduces the total time by 15 minutes. If the working period
is less than 1.5 hours, this falls by 5 minutes.
3.9
Main Distribution Frame
Introduction
The Main Distribution Frame (MDF) connects cabling to a public exchange and extensions
using Connectors.
Follow the procedures described in Chapter 4.9, "Connections to the system's MDF" on page
4-170 to attach the cables to the MDF Connectors.
All Connectors required for attaching the cables are provided with the modules and systems.
3-100
Battery capacity
7Ah
7Ah
7Ah
Battery capacity
7Ah
7Ah
7Ah
Working period
14 hours
10 hours
11 hours
Working period
11 hours
9 hours
4 hours
Service Manual

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hipath 1190Hipath 1150Hipath 1120

Table of Contents