Motorola P-7131N-FGR Product Reference Manual page 63

This guide provides configuration and setup in formation for the ap-7131n-fgr model access point.
Table of Contents

Advertisement

8. Connect the light pipe to the bottom of the access point. Align the tabs and rotate
approximately 90 degrees. Do not over tighten
9. Fit the light pipe into hole in the tile from its unfinished side.
10. Place the decal on the back of the badge and slide the badge onto the light pipe from the
finished side of the tile.
11. Attach the radio antennas to their correct connectors. For more information on available
antennas, see
Antenna Options on page
12. Motorola Solutions recommends attaching safety wire to the access point's safety wire tie
point or security cable (if used) to the access point's lock port.
13. Align the ceiling tile into its former ceiling space.
14. Cable the access point using either a Power Injector or approved line cord and power supply.
CAUTION Do not supply power to the access point until the cabling of the unit is
For Power Injector installations:
a. Connect a RJ-45 CAT5e (or CAT6) Ethernet cable between the network data supply (host)
and the Power Injector Data In connector.
b. Connect a RJ-45 CAT5e (or CAT6) Ethernet cable between the Power Injector Data &
Power Out connector and the access point's GE1/POE port.
c. Ensure the cable length from the Ethernet source to the Power Injector and access point
does not exceed 100 meters (333 ft). The Power Injector has no On/Off power switch.
complete.
2-4.
Hardware Installation
2-17

Advertisement

Table of Contents
loading

Table of Contents