Suzuki 2000 Grand Vitara SQ625 Service Manual page 378

Table of Contents

Advertisement

6A2-54 ENGINE MECHANICAL (H25 ENGINE)
LH bank
1. LH bank intake camshaft
2. LH bank exhaust camshaft
3. LH bank cylinder head
4. Match mark
INSTALLATION
1) Before installing valve lash adjuster to cylinder head, fill oil pas-
1. Cylinder head
2. Oil hole
2) Valve lash adjuster to cylinder head.
3) Check timing mark on crankshaft as shown in figure.
1. Crank timing pulley key
2. Oil jet
4) Install RH bank camshafts, referring to item "RH (NO.2) BANK
5) Install LH bank camshafts.
sage of cylinder head with engine oil according to following pro-
cedure.
Pour engine oil through oil holes and check that oil comes out
from oil holes in sliding part of valve lash adjuster.
Perform this check on both intake and exhaust sides.
Apply engine oil around valve lash adjuster and then install it to
cylinder head.
2ND TIMING CHAIN AND CHAIN TENSIONER" in this section
for installation.
Apply oil to sliding surface of each camshaft and camshaft jour-
nal then install them by aligning match marks on cylinder head
and LH bank camshafts as shown in figure.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2000 grand vitara sq4162000 grand vitara sq420

Table of Contents