Suzuki 2000 Grand Vitara SQ625 Service Manual page 263

Table of Contents

Advertisement

1. Pin
2. Crankshaft pulley
3. Pulley bolt
5) Install timing belt and tensioner spring.
With two sets of marks aligned and tensioner plate pushed up,
install timing belt on two pulleys in such a way that drive side of
belt is free from any slack.
And then install tensioner spring as shown in figure, and hand-
tighten tensioner stud.
NOTE:
_ When installing timing belt, match arrow mark (
_ In this state, No. 4 piston is at top dead center of compres-
1. Drive side of belt
2. Tensioner spring
3. Tensioner stud
4. Damper
6) To take up slack of timing belt, turn crankshaft two rotations
clockwise after installing it. After making sure that belt is free
from slack, tighten tensioner stud first and then tensioner bolt to
each specified torque.
Then confirm again that two sets of marks are aligned respec-
tively.
Tightening Torque
(a): 11 N
(b): 25 N
7) Install timing belt outside cover.
Before installing, make sure that seal is between water pump
and oil pump case.
Tightening Torque
(a): 11 N
8) Install crankshaft pulley.
Fit hole of pulley to pin on crankshaft timing belt pulley, and tight-
en pulley bolts to specified torque.
Tightening Torque
(a): 16 N
ENGINE MECHANICAL (G16 ENGINE) 6A1-21
timing belt with rotating direction of crankshaft.
sion stroke.
.
m (1.1 kg-m, 8.0 lb-ft)
.
m (2.5 kg-m, 18.0 lb-ft)
.
m (1.1 kg-m, 8.0 lb-ft)
.
m (1.6 kg-m, 11.5 lb-ft)
) on

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2000 grand vitara sq4162000 grand vitara sq420

Table of Contents