Download Print this page

Toshiba T1200 User Manual page 33

Hide thumbs Also See for T1200:

Advertisement

PCB.
(Test extent : F0000H - FFFFFH 64KB)
Subtest 02
HDD off-SW
Note:
Confirm that turn the HDD switch on.
After checking the operation of the HDD switch, confirm
that signals are being exchange between the CPU and the
PS (Power Supply).
Operation for the test is as follows.
1. After executing the test, the following message will
2. Turn the HDD switch off. The following message will
3. Press Enter, then return to the
MODEL:T1200H/HB
Page 3-7
3.5 MEMORY TEST
Subtest 01
RAM constant data (Execution time: 58 seconds)
This test writes constant data to Memory, and then reads
and compares them with the original data. The constant
data are "FFFFH", "AAAAH", "5555H", "0101H" and "0000H".
Subtest 02
RAM address pattern data (Execution time: 17 seconds)
This test makes the segment address and offset address by
XORing, and then writes the address pattern data and reads
and compares them with the original data.
Subtest 03
RAM refresh (Execution time: 34 seconds)
This test writes constant data in 256 bytes length to
Memory, and then reads and compares it with the original
data. The constant data are "AAAAH" and "5555H". A certain
interval time will be taken between the write and the read
operations.
Subtest 04
Expansion bus (Execution time: 3 seconds)
Note:
As this test requires a special tool to be executed, it
appear.
*** HDD off-switch test start ***
appear.
*** HDD off-switch test OK ! ***
system test.
subtest menu of the

Advertisement

loading