CHAPTER 2 SEQUENCE OF OPERATIONS

1.3 Sequence of Basic Operations

1.3.1 Basic Sequence of Operations at Power-On

Fixing main heater (H1)
Fixing sub heater (H2)
Fixing motor (M19)
Main motor (M2)
Drum motor (M1)
Pre-exposure LED (LA1)
Primary charging
Grid bias
Developing bias (DC)
Developing bias (AC)
Bias roller
Pre-transfer charging (DC)
Pre-transfer charging (AC)
Transfer charging
Separation charging (DC)
Separation charging (AC)
Surface potential measurement
Primary, pre-transfer, transfer,
separation charging cleaning motor
*1: For copying, potential control is executed as follows: VD, 8 times max.; VL1, 8 times
max.; and VL2, once.
*2: For printing, potential control is executed as follows: VD, 8 times max.; VL1, 8 times
max.; VL2, once.
*3: If the surface temperature of the fixing roller is 150ºC or higher when the power switch
is turned on, the machine will assume that potential control for power-on has been ex-
ecuted once, thus not executing it any more. (This, however, does not apply if potential
control ended in error or potential control is executed in service mode.)
*4: If the surface temperature of the fixing roller when the power is turned on is 100ºC or
lower, the primary/pre-transfer/transfer/separation charging wire will be cleaned.
(Cleaning is also executed each time 2000 copies have been made.)
2-4 P
Download Free Service Manual at http://printer1.blogspot.com
Power switch ON
195˚C
WMUP INTR
VD
*4
F02-103-01 Basic Sequence of Operations
COPYRIGHT © 2000 CANON INC.
CNTR1
CNTR2
/
/
*1,*3
/
/
*2,*3
VL1
VL2
VD
VL1
VL2
2000 2000 2000 2000
CANON iR5000/iR6000 REV.0 JULY 2000
200˚C
LSTR
STBY
Controlled to 200 ˚C
Controlled to 200 ˚C