Christie J series 2.0kW Service Manual page 49

J series
Table of Contents

Advertisement

9. Install the lens mount handle:
a. Apply Loctite® to the new set screw.
b. Insert the set screw into the handle shaft and turn it clockwise two full turns.
c. Position the handle mount dowel with the flat surface facing up.
d. Slide the handle shaft onto the dowel with the set screw facing up.
e. Torque the set screw to 8in-lb.
10. Install the lens mount
a. Align the lens mount with the dowel on the lens mount backing plate. Insert and tighten the 4 backing
plate screws.
b. Connect the 5 lens mount harnesses to the lens mount.
c. Replace the front cover and tighten the 6 captive screws.
d. Replace the dust shield and tighten the 6 screws.
e. Replace the top cover and tighten the 8 captive screws.
11. Apply a boresight alignment with the new lens mount. See
J Series 2.0, 2.4, and 3.0kW Service Manual
020-100739-01 Rev. 1 (01-2012)
Section 4: Parts and Module Replacement
Boresight
Alignment.
4-29

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

J series 2.4kwJ series 3.0kwJ 2.0kwJ 2.4kwJ 3.0kw

Table of Contents