2. Remove the top lid of the cinema projector:
a. Loosen the 7 screws that secure the top lid to the cinema projector
b. Lift the lid up from the rear of the cinema projector and set it aside.
3. Remove the service door:
a. Reach into the cinema projector and remove the first service panel screw.
b. Open the integrator rod access door and remove the second service panel screw.
c. Push the clips on the top of the service panel down and out to remove the service panel.
CP2210 User Manual
020-100410-08 Rev. 1 (05-2014)
Section 2: Installation and Setup
.
2-9