Verifying Proper Operation - Brocade Communications Systems ICX 6430 Installation Manual

Stackable switches
Hide thumbs Also See for ICX 6430:
Table of Contents

Advertisement

3

Verifying proper operation

1. Remove the power cord from the shipping container.
2. Attach the AC power cord to the AC connector on the rear panel.
3. Insert the power cord plug into a 100V-240V outlet.
NOTE
To turn the system off, simply unplug the power cord or cords.

Verifying proper operation

After you have installed an external power supply, verify that the device is working properly by
plugging it into a power source and verifying that it passes the self test.
1. Connect the power cord supplied with the device to the power connector on the power supply
2. Insert the other end into a properly grounded electrical outlet.
3. Verify that the LED for the power supply is green.
4. Verify proper operation by observing the LEDs.
52
on the rear of the device.
LEDs for linked ports will come on during the boot process, then all LEDs will go off. Once the
boot sequence is complete, LEDs for linked ports will again come on.
For more details on specific LED conditions after system start-up, refer to,
Brocade ICX 6430 and ICX 6450 Stackable Switches Hardware Installation Guide
"LEDs"
on page 40.
53-1002738-02

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Icx 6450

Table of Contents