Body Solid G9S Assembly Instructions Manual page 41

Hide thumbs Also See for G9S:
Table of Contents

Advertisement

Start at high pulley station by
inserting the Metal Ball End here.
Lat Pulldown
Cable
WA R N I N G
!
Selector Rod Top Bolt (52) must be threaded a
minumum of 1/2" into the Selector Rod (6), and Jam
Nut (54) tightened securely against spring lock
washer (53) to ensure proper connection. Check the
Jam Nut (54) once a week to make sure it is tight.
!
39
S T E P
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents