Step 9 - Body Solid G9S Assembly Instructions Manual

Hide thumbs Also See for G9S:
Table of Contents

Advertisement

S T E P
9
Be careful to assemble all components
in the sequence they are presented.
Most of the main frame parts in this step will have
YELLOW dots.
A.
Attach three End Caps (13) to the front and sides of Pec Dec Frame (H), and attach Square
Rubber Cap (32) to the top of the Pec Dec Frame (H).
B.
Slide Oilite Washer (9), Left Pec Dec Arm (AK) and then the Left Pec Dec Cam (AL) onto
the left side of the Pec Dec Frame (H) as shown, Attach using:
One 59 (1/2"x 1" hex head bolt)
One 93 (1/2" washer)
C.
Slide Round End Cap (29) into Left Pec Dec Handle (AM) and attach to the
Left Pec Dec Arm (AK) using:
One 85 (5/16"x 3/4" flat allen head)
One 96 (5/16" spring lock washer)
Note:
Left Pec Dec Handle (AM) should bend out, away from the the gym, as shown.
D.
Slide Oilite Washer (9), Right Pec Dec Arm (AP) and then the Right Pec Dec Cam (AQ)
onto the Right side of the Pec Dec Frame (H) as shown, attach using:
One 59 (1/2"x 1" hex head bolt)
One 93 (1/2" washer)
E.
Slide Round End Cap (29) into Right Pec Dec Handle (AR) and attach to the
Right Pec Dec Arm (AP) using:
One 85 (5/16"x 3/4" flat allen head)
One 96 (5/16" spring lock washer)
Note:
Right Pec Dec Handle (AR) should bend out, away from the gym, as shown.
F.
Attach two Chrome Collars (106) to the top of Left Pec Dec Handle (AM) and Right Pec
Dec Handle (AR) using:
Two 88 (5/16" allen screw) preinstalled
You should now wrench tighten all bolts and nuts in this step.
Do NOT re-tighten any of the pad bolts or pulley bolts.
mm
Inch
26

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents