Step 3 - Body Solid G9S Assembly Instructions Manual

Hide thumbs Also See for G9S:
Table of Contents

Advertisement

S T E P
3
Be careful to assemble all components
in the sequence they are presented.
NOTE:
Finger tighten all hardware in this step. Do Not wrench tighten until end of step 5.
A.
Place two Weight Stack Risers (55) and two Rubber Donuts (31) onto Main Base Frame (A)
as shown. Slide two Guide Rods (J) through the Rubber Donuts (31), the Weight Stack
Risers (55), and into the Main Base Frame (A).
B.
Slide 20 Weight Stack Plates (51) onto the two Guide Rods (J). Make sure the opening in
each weight stack plate, for the Weight Stack Pin (1), is facing outward.
C.
Attach Top Plate (8) to Selector Rod (6) using:
One 77 (3/8"x 2" flat allen head)
Slide Top Plate (8) and Selector Rod (6) onto Guide Rods (J).
D.
Place two Weight Stack Risers (55) and two Rubber Donuts (31) onto Side Base Frame (B)
as shown. Slide two Guide Rods (J) through the Rubber Donuts (31), the Weight Stack
Risers (55), and into the Side Base Frame (B).
E.
Slide 20 Weight Stack Plates (51) onto the two Guide Rods (J). Make sure the opening in
each weight stack plate, for the Weight Stack Pin (1), is facing outward.
F.
Attach Top Plate (8) to Selector Rod (6) using:
One 77 (3/8"x 2" flat allen head)
One 99 (3/8" lock washers)
Slide Top Plate (8) and Selector Rod (6) onto Guide Rods (J).
G.
Slide four Shaft Collars (22) onto the four Guide Rods (J) as shown.*
*NOTE:
Do not tighten the allen screw inside Shaft Collars (22), leave them loose.
mm
Inch
14

Hide quick links:

Advertisement

Table of Contents
loading