Figure 69 Fake Power Supply Module - Zte ZXR10 8900 Series Hardware Installation Manual

Zxr10 8900 series 10 gigabit routing switch
Hide thumbs Also See for ZXR10 8900 Series:
Table of Contents

Advertisement

1. Hold both sides or hold the bottom of the power module guard
2. Pull the guard upward and remove it. Loosen the captive screw
3. Hold the plastic guard of the module and pull it outward forcibly
Result: Power module of ZXR10 8902 has been unplugged.
Fake power supply module is required in the case of no three power
Install and
Remove Fake
supply modules, which consists of installation plate, metallic-rect-
Power Supply
angular frame, fake power supply module cover and power module
Module
guard, as shown in
F
IGURE
1.
2.
with hands.
on the bottom side of the module.
until it is pulled out.
Figure
69 F
P
S
AKE
OWER
Installation plate
Metallic-rectangular frame
Install fake power supply module
To install fake power supply module, the necessary space
needs to be left for using screwdriver. Therefore, fake power
supply module shall be installed before plugging card, or
unplug the card before installation. Plug the fake power supply
module into its corresponding module slot and remove the
power guard, as shown in
and fixed screw (M3 × 8).
Confidential and Proprietary Information of ZTE CORPORATION
Chapter 5 Master Device Installation
69.
M
UPPLY
ODULE
3.
Fake power supply module cover
4.
Power module guard
Figure
70. Fasten captive screws
73

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zxr10 8912Zxr10 8908Zxr10 8905Zxr10 8902

Table of Contents