Installation Of Cabling Rack; Installing Vertical Supporter - Zte ZXR10 8900 Series Hardware Installation Manual

Zxr10 8900 series 10 gigabit routing switch
Hide thumbs Also See for ZXR10 8900 Series:
Table of Contents

Advertisement

To unplug fan plug-in box of ZXR10 8902, perform the following
Unplug Fan
Plug-in Box
steps.
1. Loosen the captive screws on the upper and lower side of the
fan plug-in box using a cross screwdriver.
2. Catch hold of the handle of the fan plug-in box and pull the box
out forcibly.
Result: Fan plug-in box of ZXR10 8902 has been unplugged.

Installation of Cabling Rack

Cabling rack is provided for cabling in engineering installation with
ZXR10 8912, ZXR 8908 or ZXR10 8905. Cabling rack includes
vertical supporter and horizontal cable plate. Vertical supporter is
necessary and horizontal cable plate is optional.

Installing Vertical Supporter

ZXR10 8912, ZXR10 8908 and ZXR10 8905 adopt the same
method to install vertical supporter.
example to introduce how to install vertical supporter.
Install vertical supporter in cabinet
Make sure that the plug-in box has been plugged in cabinet al-
ready before vertical supporter is installed. Keep waist-round
holes of vertical supporter and that of plug-in box on the same
line, fix the vertical supporter in cabinet with three crown
screws, fasten the crown screws, as shown in
Confidential and Proprietary Information of ZTE CORPORATION
Chapter 5 Master Device Installation
Take ZXR10 8908 for an
Figure
77.
79

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zxr10 8912Zxr10 8908Zxr10 8905Zxr10 8902

Table of Contents