Equipment Component; Figure 2 Side Elevation Of Zxr10 8912 - Zte ZXR10 8900 Series Hardware Installation Manual

Zxr10 8900 series 10 gigabit routing switch
Hide thumbs Also See for ZXR10 8900 Series:
Table of Contents

Advertisement

ZXR10 8900 Series Hardware Installation Manual
4
Confidential and Proprietary Information of ZTE CORPORATION

Equipment Component

ZXR10 8900 is composed of the following parts:
19"standard cabinet (optional)
ZXR10 8900 case
Card
Power supply module
Fan modules
Master device can be installed in 19" standard cabinet, and it also
can be installed on working table. 19"standard cabinet is shipped
with equipment but it also can be provided by customer them-
selves.
The side elevation of ZXR10 8912 is shown in
F
2 S
E
IGURE
IDE
LEVATION OF
The side elevation of ZXR10 8908 is shown in
ZXR10 8912
Figure
2.
Figure
3.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zxr10 8912Zxr10 8908Zxr10 8905Zxr10 8902

Table of Contents