Positioning Fixed Base; Figure 27 19D8H20 Single Cabinet Fixed Base Diagram - Zte ZXR10 8900 Series Hardware Installation Manual

Zxr10 8900 series 10 gigabit routing switch
Hide thumbs Also See for ZXR10 8900 Series:
Table of Contents

Advertisement

ZXR10 8900 Series Hardware Installation Manual
34
Confidential and Proprietary Information of ZTE CORPORATION
F
27 19D8H20 S
IGURE
This design is only for reference. Customer can design it according
to the specific requirements.

Positioning Fixed Base

Define for cabinet installation positions as per standard dimensions
given in the layout drawings.
To position fixed base, perform the following steps.
1. Marking
Make sure of the base installation position as per the standard
dimensions and cabinet dimensions given in the layout draw-
ings. Measure the marking points with the tape and mark out
two straight lines with a distance of 696mm that are parallel
with the benchmark. Define the position of 4 installation holes
on two lines as per design.
Positions of cabinet installation holes are shown in
With reference to them, mark out installation holes for other
bases. Verify measurement after marking of all installation
holes to avoid mistake and make sure that all measurements
are correct.
C
F
B
INGLE
ABINET
IXED
D
ASE
IAGRAM
Figure
28.