Installing Cabinet By Fixed Base; Figure 37 Remove Truckles - Zte ZXR10 8900 Series Hardware Installation Manual

Zxr10 8900 series 10 gigabit routing switch
Hide thumbs Also See for ZXR10 8900 Series:
Table of Contents

Advertisement

ZXR10 8900 Series Hardware Installation Manual
Fix Cabinet by
Pressure Plate
44
Confidential and Proprietary Information of ZTE CORPORATION
Note:
Insulation test has to be implemented immediately after each
cabinet footing is fixed.
Result: Cabinet has been installed on floor directly.

Installing Cabinet by Fixed Base

When cabinet bottom is installed by a fixed base, the cabinet can
be fixed by two methods.
Fix cabinet by pressure plate
Fix Cabinet by locknuts
Take cabinet 19D8H20 as an example to describe how to install.
To fix cabinet by using pressure plate, perform the following steps.
1. Cabinet Height Regulation
There are four footings and truckles on the cabinet base.
Loosen the four bolts that fasten the truckles, as shown in
Figure
37. Remove four truckles. Place the cabinet on the
installation base manually or by lifting machine. Make sure
that the right, left, front and back plane of cabinet are parallel
with the NOC room walls. Use the height adjusting nut on
footing to regulate the height of cabinet.
F
37 R
IGURE
EMOVE
1.
Cabinet
2.
Footing
2. Cabinet Leveling
T
RUCKLES
3.
4.
Truckle
Bolt