ZXR10 8900 Series Hardware Installation Manual
22
Confidential and Proprietary Information of ZTE CORPORATION
Positioning Adjustable Base
Make sure of base installation position as per standard dimensions
and cabinet dimensions given in layout drawings. Measure the
marking points with the tape and mark out two straight lines with
a distance of 610mm that are parallel with benchmark.
1. Define for the position of installation holes on two lines as per
the design. With reference to them, mark out installation holes
for other bases. Verify measurement after marking of all in-
stallation holes to avoid mistake and make sure that all mea-
surements are correct.
Position holes of single cabinet are shown in
F
14 P
IGURE
OSITION OF
1.
Equipment room wall
2.
M12 expand bolt installation
hole
Position holes of many cabinets are shown in
S
C
I
INGLE
ABINET
NSTALLATION
3.
Adjustable base
4.
Cabinet outline
5.
Front door of Cabinet
Figure 14
and .
Figure
15.