Installation Of Base Directly On Floor; Installation Flow Of Base Directly On Floor; Figure 18 Adjustable Shims; Figure 19 Single Cabinet Base Installation Diagram - Zte ZXR10 8900 Series Hardware Installation Manual

Zxr10 8900 series 10 gigabit routing switch
Hide thumbs Also See for ZXR10 8900 Series:
Table of Contents

Advertisement

F
18 A
IGURE
DJUSTABLE
1.
1mm washer
Single cabinet base installation is shown in
F
19 S
IGURE
INGLE
Result: Adjustable base has been installed.

Installation of Base Directly on Floor

Installation Flow of Base Directly on Floor

This installation mode is suitable for cement ground, adopting
pressure plate to fix footings with ground.
Installation flow is shown in
Confidential and Proprietary Information of ZTE CORPORATION
Chapter 4 19" Standard Cabinet Installation
S
HIMS
2.
C
B
I
ABINET
ASE
NSTALLATION
Figure
20.
2mm washer
Figure
19.
D
IAGRAM
27

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zxr10 8912Zxr10 8908Zxr10 8905Zxr10 8902

Table of Contents