ZXR10 8900 Series Hardware Installation Manual
58
Confidential and Proprietary Information of ZTE CORPORATION
Front panel and back panel are necessary for one cabinet. Use
M5×12 screws to connect the top panel with top of cabinet, as
shown in
Figure
F
55 T
P
IGURE
OP
ANEL
1.
Screw M5×12
2.
Cabinet
2. Install top inside panel
i. Open angle support on one side of cabinet top.
ii. Fix angle support and top inside panel on top of cabinet.
iii. Tighten top panel and top inside panel by M5×12 screws.
iv. Perform the same steps to install the other side top inside
panel.
Top inside panel installation diagram is shown in
55.
I
D
NSTALLATION
IAGRAM
3.
Top panel
Figure
56.