Power Supply Cable
Inspection
Power cable inspection includes the following parts:
Power cable check
The connection of all power cables must be reliable and the
polarity must be correct.
Grounding cable
Confirm whether the -48VGND, GND and PE are correctly and
reliably connected.
Intra-cabinet and inter-cabinet cables
The clock cables, power alarm and testing cables must be cor-
rectly and reliably connected. The cable routing and tie-up
distance are correct. The cable ties must not be pointed and
overlapped.

Cabling Inspection

Cabling inspection includes the following parts:
Each type of cable must be loose instead of tense at the bend.
The routing must be laid according to the specified position and
the binding space must be consistent.
The cabling must be smooth; no cable in the rack must be
crossed. And all cables outside the rack must be bound ac-
cording to different cabinets.
The cables on the trough and cabling ladder must be tidy. All
cables must be bound and this is not allowed to damage the
external sheath.
Required redundancy must be left for all cables. In addition,
all cable ties must be cut evenly so that there is no protruding
prick.

Label Inspection

All labels must be tidy and clean. In addition, their marks and
locations must be correct.