Plugging And Unplugging Card; Figure 61 Installation Of Subrack - Zte ZXR10 8900 Series Hardware Installation Manual

Zxr10 8900 series 10 gigabit routing switch
Hide thumbs Also See for ZXR10 8900 Series:
Table of Contents

Advertisement

9. The right side of plug-in box is installed on the support rails
with three crown screws through vertical supporter. For more
information about vertical supporter, please refer to
Vertical Supporter
Installation diagram is shown in
F
IGURE
Result: Plug-in box has been installed
Plugging and Unplugging
Card
To plug a card, perform the following steps.
Plug a Card
1. The card structure is shown in
61 I
S
NSTALLATION OF
Confidential and Proprietary Information of ZTE CORPORATION
Chapter 5 Master Device Installation
Figure
61.
UBRACK
Figure
62.
Installing
67

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zxr10 8912Zxr10 8908Zxr10 8905Zxr10 8902

Table of Contents