Figure 28 19D8H20 Single Cabinet Installation Diagram; Table 8 Fixed Base Installation Marking Size (Mm) - Zte ZXR10 8900 Series Hardware Installation Manual

Zxr10 8900 series 10 gigabit routing switch
Hide thumbs Also See for ZXR10 8900 Series:
Table of Contents

Advertisement

F
28 19D8H20 S
IGURE
1.
Equipment room wall
2.
M12 expand bolt installation
hole
For the value of C and D, please refer to
T
8 F
B
ABLE
IXED
ASE
Cabinet name
19D8H20 Cabinet
L1 is the distance from side gate to the wall of cabinet room,
L1≥900mm.
L2 is the distance from front gate to the wall of cabinet room,
L2≥1500mm.
Note:
Verify measurement after marking of all installation holes to
avoid mistake and make sure that all measurements are cor-
rect.
2. Installation of the Adjustable Base
Drill φ14 at the expansion bolt hole marked on the floor with
a depth of 90 mm.
Make sure drill is perpendicular to floor when drilling with per-
cussion drill (or hammer). Hold handle tightly and vertically to
Confidential and Proprietary Information of ZTE CORPORATION
Chapter 4 19" Standard Cabinet Installation
C
I
INGLE
ABINET
NSTALLATION
3.
Base
4.
Cabinet outline
5.
Front door of Cabinet
I
M
NSTALLATION
ARKING
C
L2+52
D
IAGRAM
Table
8.
S
(
)
IZE
MM
D
L1+40
35