Figure 36 Cabinet Base Is Installed On Floor Directly - Zte ZXR10 8900 Series Hardware Installation Manual

Zxr10 8900 series 10 gigabit routing switch
Hide thumbs Also See for ZXR10 8900 Series:
Table of Contents

Advertisement

must not exceed 3mm. Fasten the locknut upward to fix the
cabinet footing. The fastening torque has to reach 45Nm.
3. Cabinet Fixation
As shown in
Figure
footing and place the insulated tube on expansion bolt. At
last fix the cabinet with flat washer, spring washer and blot.
The fastening torque has to reach 45Nm. The pressure plate
is attached with an insulated rubber pad. Pressure plate and
insulated pad are shown in
F
36 C
IGURE
ABINET
1.
Flat Washer
2.
Insulated Tube
3.
Cabinet
4.
Nut M12
4. Insulation Test
Modify the multimeter to resistance grade. Use the two mea-
suring heads to touch the cabinet earthing point and expansion
bolt. Measure their resistance. Continue the next step if the
circuit is an open circuit. If the result shows that it is not an
open circuit, then the cabinet is not insulated with earth. Ex-
amine the insulated tube. Repeat the last step and insulation
test.
Confidential and Proprietary Information of ZTE CORPORATION
Chapter 4 19" Standard Cabinet Installation
36, press the pressure plate on the cabinet
Figure
36.
B
I
ASE IS
NSTALLED ON
5.
6.
7.
8.
F
D
LOOR
IRECTLY
Spring Washer
Pressure Plate
Footing
Expansion Bolt
43

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zxr10 8912Zxr10 8908Zxr10 8905Zxr10 8902

Table of Contents