Figure 38 Footing Structure - Zte ZXR10 8900 Series Hardware Installation Manual

Zxr10 8900 series 10 gigabit routing switch
Hide thumbs Also See for ZXR10 8900 Series:
Table of Contents

Advertisement

The cabinet must be vertically installed. Place level bar on
the two perpendicular directions of cabinet top panel. Use the
height adjusting nut to regulate the horizontality and verticality
of cabinet, as shown in
verticality deviation must not exceed 3mm. Fasten the locknut
upward to fix the cabinet footing. The fastening torque has to
reach 45Nm.
F
38 F
IGURE
OOTING
1.
M16 bolt
2.
Locknut
3. Cabinet Fixation
Press the pressure plate on the cabinet footing. Make the bolt
through the fixed bottom, and place the insulated tube on bolt.
At last fix the cabinet with flat washer, spring washer and blot.
The fastening torque has to reach 45Nm. The pressure plate is
attached with an insulated rubber pad. Pressure plate is shown
in
Figure
39.
Confidential and Proprietary Information of ZTE CORPORATION
Chapter 4 19" Standard Cabinet Installation
Figure
38. Installed horizontality and
S
TRUCTURE
3.
Height Adjusting Nut
4.
Insulated Rubber Pad
45

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zxr10 8912Zxr10 8908Zxr10 8905Zxr10 8902

Table of Contents