Installing Power Supply Module Of Zxr10 8902; Figure 70 Install And Remove Fake Power Supply Module - Zte ZXR10 8900 Series Hardware Installation Manual

Zxr10 8900 series 10 gigabit routing switch
Hide thumbs Also See for ZXR10 8900 Series:
Table of Contents

Advertisement

ZXR10 8900 Series Hardware Installation Manual
Plug Power Supply
Module
74
Confidential and Proprietary Information of ZTE CORPORATION
F
70 I
IGURE
NSTALL AND
1.
Fake power supply module
2.
Captive Screw
Remove fake power supply module
Unplug card to leave enough space for using screwdriver be-
fore fake power supply module is removed. Remove the power
module guard, loose captive screw and fixed screw ((M3 × 8).
Pull fake power supply module out.
Installing Power Supply Module of
ZXR10 8902
To plug power module of ZXR10 8902, perform the following steps.
1. Align the power module with the module slot on the plug-in
box, as shown in
R
F
P
EMOVE
AKE
OWER
3.
Figure
71.
S
M
UPPLY
ODULE
Screw

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zxr10 8912Zxr10 8908Zxr10 8905Zxr10 8902

Table of Contents