Configuring The Service Processor - Fujitsu Sparc Enterprise T5120 Installation Manual

Hide thumbs Also See for Sparc Enterprise T5120:
Table of Contents

Advertisement

Tip – The serial terminal or a terminal emulator should be connected before you
connect the power cables. As soon as AC power is connected to the system, the
service processor immediately powers on and runs diagnostics. Diagnostic test
failures will be printed on the serial terminal. For more information, refer to the
Integrated Lights Out Manager 2.0 Supplement for SPARC Enterprise T5120 and T5220
Servers.
3. Connect the data cables to the server, but do not connect the AC power cable yet.
See
"Connecting the Server Cables for Both Servers" on page
4. Connect the AC power cable to the server and examine the display for any error
messages. See
"Powering On the System for the First Time" on page
Caution – There is a potential for electric shock if the server and related equipment
are not properly grounded.
Note – The service processor runs on the 3.3V standby voltage. As soon as AC
power is connected to the system, the service processor immediately powers on, runs
diagnostics, and initializes the ILOM firmware.
Related Information
"Configuring the Service Processor" on page 9

Configuring the Service Processor

1. After the service processor boots, access the ILOM command-line interface (CLI)
through the serial management port. See
the Network Management Port" on page
2. Configure the service processor network addresses. See
Processor Network Management Port" on page
Note – The service processor network management port is not operational until you
configure network settings for the service processor (through the service processor
serial management port).
34.
"To Log Into the Service Processor Using
55.
"To Configure the Service
52.
Preparing for Installation
43.
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sparc enterprise t5220

Table of Contents