3. Connect the chassis ground wire to the facility earth ground and ensure that
this connection has proper bonding.
4. Connect the -48v or -60V return to the -48 v or -60V wires to the circuit breaker.
5. Connect the power wiring to the server by plugging each power cable into the
server power supply units.
6. When you are ready to power up the server, close the circuit breaker and
following booting procedure described in,
Time" on page
43.
Related Information
"Assembling and Installing the DC Input Power Cables" on page 87
■
Assembling and Installing DC Power Cables for the SPARC Enterprise T5120 Server
"Powering On the System for the First
97