2. Unlock the slide lock buttons at the right and left sides of the chassis.
3. Slowly pull the server out of the rack until the slide rails reach their stops.
Unlocking the Slide Rail Assembly (Either Server)
FIGURE:
4. Inspect any attached cables for binding or kinks.
5. Verify that the CMA extends fully and does not bind in the slide rails.
6. Verify that the server extends fully and locks in the maintenance position.
The server should stop after approximately 15 in. (40 cm) of travel.
7. Pull both slide rail release buttons toward you simultaneously and slide the
server back into the rack.
The server should slide smoothly into the rack without binding.
Installing the SPARC Enterprise T5120 and T5220 Servers
33