Fujitsu Sparc Enterprise T5120 Installation Manual page 81

Hide thumbs Also See for Sparc Enterprise T5120:
Table of Contents

Advertisement

2. To initiate the power-on sequence, type the start /SP/console command.
You will see an ILOM CLI alert message on the system console. This message
indicates that the system has reset.
-> start /SP/console
Are you sure you want to start /SP/console (y/n)? y
Serial console started.
The CPU and memory controllers initialize, and eventually OpenBoot initializes.
After a number of system console messages, the ok prompt appears, or the system
will boot into the Solaris OS.
Note – System behavior depends on how the auto-boot variable is set. See the
SPARC Enterprise T5120 and T5220 Servers Administration Guide for more information.
The following example output is a small section of the complete output.
0:1:0>
0:1:0>SPARC-Enterprise[TM] T5120/T5220 POST 4.27.x.
2007/12/11 18:55
...
0:1:0>Network Interface Unit Tests....Done
0:1:0>Functional CPU Tests....Done
0:1:0>Extended Memory Tests....Done
2007-12-14 16:45:28.800 0:1:0>INFO:
2007-12-14 16:45:28.806 0:1:0>
2007-12-14 16:45:28.816 0:1:0>POST:
2007-12-14 16:45:28.824 0:1:0>Master set ACK for vbsc runpost
command and spin...
SPARC Enterprise T5220, No Keyboard
Copyright 2007 Sun Microsystems, Inc.
OpenBoot 4.27.x, 3968 MB memory available, Serial #74409918.
Ethernet address 0:14:4f:6f:67:be, Host ID: 846f67be.
{0} ok
Related Information
"Devices in the OpenBoot Device Tree" on page 60
Integrated Lights Out Manager (ILOM) 2.0 Supplement for SPARC Enterprise T5120
and T5220 Servers
To stop, type #.
POST Passed all devices.
Return to VBSC.
All rights reserved.
Powering On the System
59

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sparc enterprise t5220

Table of Contents