Installing the SPARC Enterprise
T5120 and T5220 Servers
This chapter provides instructions for installing the servers into an equipment rack.
Note – If your rackmounting kit came with its own instructions, use the instructions
in your rackmounting kit instead of the instructions in this chapter. After performing
the server installation, proceed to
first-time power on.
This chapter contains the following sections:
"Installing the Servers in a Rack" on page 19
■
"Installing the Cable Management Arm for Both Servers" on page 27
■
"Connecting the Server Cables for Both Servers" on page 34
■
"Managing Cables With the CMA" on page 39
■
"Dismounting the Servers" on page 40
■
Note – References to left and right are from your viewpoint as you face either the
front or rear of the equipment.
Installing the Servers in a Rack
Note – Ensure that you have all of the parts in the rackmounting kit before you
begin the installation of the server.
Note – The procedures in this chapter are the same for both the 1U and 2U servers.
The illustrations show a 2U server only as an example.
"Powering On the System" on page 43
for
19