Before you begin the installation procedure, verify that the required conditions
described in the following table have been satisfied.
TABLE:
Prerequisite Condition
Install a DC power source that meets the server's input power
specifications.
Secure DC power cables that meet the server's power cabling
specifications.
Attach the DC input plug to the DC input power cables. The input plug
is provided in the server's shipping kit.
Related Information
"To Assemble the DC Input Power Cables" on page 88
■
▼ To Assemble the DC Input Power Cables
1. Turn off power from the DC power source using the circuit breakers.
Caution – Do not proceed with these instructions until you have turned off the
power from the DC power source through the circuit breakers.
2. Identify the parts that you will use to assemble the DC input power cables
For each cable, you need the three parts shown in the figure below. These items
are provided in the shipping kit that came with your server.
88
SPARC Enterprise T5120 and T5220 Servers Installation Guide • July 2009
Prerequisites Not Covered by the DC Cable Installation Procedure
Responsible Party
Customer
Customer
Customer