L7 MEDICAL RAIL FIELD INSTALLATION PROCEDURES
Tools needed for this installation:
Electric / Battery powered drill
Drill bit size 5/16" & 1/4"
Open end / combination wrench size – 7/16
Allen wrench size – 3/16
1. Turn treadmill ON and elevate to 15% grade.
2. Turn treadmill OFF and UNPLUG from power source.
3. Remove the left and right upright cover.
4. Remove existing u-shape handrail assemblies.
5. Install new medical rail to upright as shown in assembly drawing A.
Drill Upright Mounting Holes:
A. Measure 5 5/16" down from the line where each endcap meets the upright leg.
B. Measure 1 5/16" from inside of upright leg. Using the 5/16" drill bit punch and drill the new holes at
the marked points directly below the original top mounting points of the U-shaped handles.
C. Use the white/black plugs to fill the bottom holes left by the U-shaped handles. The new medical
rails will conceal the top holes.
D. Install the handrails to the upright legs. This will allow you to mark the frame for lower mounting of
the medical rail.
Drill Bed Mounting Holes:
6. Tighten medical rail to upright frame. You will need to drill a 1/4" hole in the treadmill frame in order to
mount the lower medical rail. Use the hole in the lower medical rail as your template for drilling the
mounting hole.
7. Install the lower medical rail mounting hardware as shown in assembly drawing B.
Assembly Drawing – A
th
th
(should be included with hardware kit)
Assembly Drawing – B
81