Download Print this page

Alamo John Deere 6215 Assembly & Instruction Manual page 98

Advertisement

Boom Hoses / Tank Hoses:
1.
Install Swing Cylinder Hoses. These # 6
hoses, The Cylinder Base end is a # 6 X 44" Long
Hose (Hose Part # 02976735) with a Green Plastic
Tie with a White Stripe on it. The Cylinder Rod End
has a # 6 X 44" long Hose (Hose Part # 02976734)
with a Solid Green Plastic Tie on it. Connect these
two hoses to the Cylinder and have them pointing
toward each other. The hoses will run up and over
the top of the Swing Cylinder. (See Figure 10 & 11).
2.
Install Lift Cylinder. Set Lift Cylinder Base
End into King Post Casting (See Figure 12). Note
the Hose fittings go toward the down side of Cylinder
(See Figure 12 & 13). Insert Cylinder Retaining Pin,
Pin installs from the Backside going toward the front.
If it is installed the wrong way you will not be able to
bolt the Pin down. (See Figure 12 & 13). When
Bolting the Lift Cylinder retaining Pin in there must be
a Washer and a Bushing on the Bolt, Look at the Hole
in the Pin you will note how much larger hole is than
bolt. Do not install Retaining Bolt with out this bush-
ing, Pin will be to tight and could be damaged. (See
Figure 13).
Connect the Hoses to the Lift
Cylinder. The Lift Cylinder Hoses are # 6, Base
end is a # 6 X 64" long Hose (Hose Part #
02976710) with an Orange with White Stripe
Plastic Tie. The Rod End hose is a # 6 X 64" Long
Hose (Hose Part # 02976709) with a Solid Orange
Plastic Tie. (See Figure 14)
Figure 12
Machete (JD-62, 63, 6420 Asy Man) 10/04
© 2004 Alamo Group Inc.
Hose Installation 2 WD & 4 WD
Hose Fittings
Section 8 - 4
Cylinder
Cylinder
Rod End
Base
End
Figure 10
Boom Cyl. Hoses
Swing Cyl. Hoses
Figure 11
Front Mounting
King Post Casting
Pads
Lift Cyl. Pin
Figure 13
Hose, Green plastic
Tie with a White
Stripe on Tie
Boom Head
Motor Hoses
Lift Cyl
Hose
Elbow
Fitting
Retaining Bolt,
Washer & Bushing

Advertisement

loading

This manual is also suitable for:

John deere 6415John deere 6320John deere 6420Machete