Frame Rail Installation 2 WD & 4 WD
Pre-Installing High Frame:
1.
High Frame Shipping Pallet. The High
frame is shipped bolted to a Pallet, Do not
unbolt this from the Pallet untill the Hoist has
been connected to the High frame. The Hoist
must be supporting the weight of the High
Frame before any of the bolts holding High
frame to pallet are removed.
2.
Prepare High Frame for Lifting. There
are two lift lugs welded to the top of the High
frame for lifting it (See Figure 21). These Lugs
will lift the bare High Frame straight without the
King Post Sub-Assembly bolted to it. With the
King Post Sub-Assembly bolted to the High
Frame it will require you to adjust the length of
the lifting chain and lifting point to balance the
load (See Figure 22) and lift High frame level.
High frame must be level when lifted over
Frame rails.
3.
Level High Frame. Use two magnetic
Levels as shown. These magnets should be
installed before lifting High frame.
The First Magnetic level is put on the
Top of the High Frame on the Bottom Side
(See Figure 23). This level will allow you to
level the frame from left to right without having
to climb up later to use a Level that you hold.
The Second Magnetic Level is put on
the Kin Post Pivot toward the front of the tractor
so that it will level the High Frame from front to
rear as shown (See Figure 24).
Figure 23
Machete (JD-62, 63, 6420 Asy Man) 10/04
© 2004 Alamo Group Inc.
Top of High Frame
Magnetic Level
Section 4 - 12
Figure 21
Figure 22
King Post
Pivot Pin
Figure 24
Magnetic Level
Front of
Tractor

Advertisement

loading

This manual is also suitable for:

John deere 6415John deere 6320John deere 6420Machete