Frame Rail Installation 2 WD & 4 WD
Counter Weight Installation:
5.
Install Counter Weight Support Rod to Counter
Weight. Level and Support Counter Weight at all
times till completly welded. Weld the Support Rod
at the top where Rod meets Counter Weight (See
Figure 36), Check tha tSupport Rod is into Notch
correctly. If not hit with a hammer (See Figure 37)
to force it in, then finish welding it (See Figure
38).
6.
Counter Weight (CWT) Support Rod Installed.
The Counter weight Mounting Bracket welded to
the High frame, the Support Rod welded to the
Counter Weight. Touch up the Paint where these
were welded. Tighten the two long Allen Head
bolts that hold the Counter Weight to the Frame
Rail. Remove the Hoist and install the decal on the
side of the Counter Weight (See Figure 38 & 39)
7.
Touch Up Paint on Counter Weight. Paint the
places that you had to weld on frame and counter
weight now before installing Decals.
8.
Decals on Counter Weight. Install Decals on
Counter Weight after you have touch up the paint.
(See Figure 39 & 40).
9.
Decals on Front Pump Cover. These Decal
can be installed now if not on front cover already.
Machete (JD-62, 63, 6420 Asy Man) 10/04
© 2004 Alamo Group Inc.
(continued)
Figure 38
Figure 39
Figure 40
Section 7 - 11
Decals
Decals

Advertisement

loading

This manual is also suitable for:

John deere 6415John deere 6320John deere 6420Machete