Download Print this page

Alamo John Deere 6215 Assembly & Instruction Manual page 39

Advertisement

Frame Rail Installation 2 WD & 4 WD
Pre-Installing High Frame:
4.
Lower High frame down over Tractor.
This is a two man job in order to keep control of
High Frame on both sides of tractor (See
Figure 25). Lower the High Frame down over
the Frame rails (See Figure 26) slowly, as it
must straddle the Frame Rails (See Figure
26). Lower High Frame untill the top of the High
Frame is no higher than the cab of The Tractor;
this is a general Rule and may vary. Another
mark to look at is the Horizontal tube of the High
frame should be parallel up and down with the
Frame Rail Tube as shown on next page (See
Figure 29).
5.
Check High Frame for Level. Check
the two Magnetic Levels that you installed
earlier. The Top Level should be from side to
side of the Tractor (See Figure 27). The level
on the King Post Pivot Pin should be level
making High Frame Level straight up and Down
(See Figure 28). Leave the Magnets on the
High frame, as you will have to check then one
more time later. DO NOT do any welding at this
time.
6.
Secure High Frame to Frame Rails.
Secure the High Frame to the Frame rails with
C-Clamps on both sides (See Figure 29). Do
not weld anything at this time.
Figure 27
Machete (JD-62, 63, 6420 Asy Man) 10/04
© 2004 Alamo Group Inc.
(continued)
Figure 25
High Frame
Figure 26
Level
Figure 28
Section 4 - 13
Frame Rail
Level

Advertisement

loading

This manual is also suitable for:

John deere 6415John deere 6320John deere 6420Machete