Download Print this page

Alamo John Deere 6215 Assembly & Instruction Manual page 104

Advertisement

Boom Installation / Boom Hoses:
1.
Hoses on Booms are shipped folded
back inside Boom. Hoses must be pulled out
and moved to clear, then routed in the end of
Boom before installing Boom on the King Post
(See Figure 1)
2.
Pull the Lift Cylinder out to its full stroke,
to aid in the installation of the Lift arm (See
Figure 1). When Pulling Cylinder Out, attach a
Hose to the Rod end and lay the Hose in a drain
pan. This will catch any Oil expelled when Cyl-
inder is pulled out.
3
.
With a hoist raise the Boom Arm (1)
and lower onto the King Post (2). Align the
Boom Arm and King Post with the Lift Hinge
Point.
Insert Main Pin Bolt (3) into Boom
Weldment and Turning Arm.
Lockwasher (4), Washer (5) and Bolt (6) and
tighten (also see Parts Section on the Boom
Assembly) (See Figure 2)
4.
Attach the Rod end of the Lift Cylinder
(7) to the Lift Section with Pin (8), Bolt (9) and
Nut (10) (also see Parts Section on the Boom
Assembly) (See Figure 3).
Note: Additional support may
be need at the end of the Boom
to aid in installation.
3,4,5,6
2
Machete (JD-62, 63, 6420 Asy Man) 10/04
© 2004 Alamo Group Inc.
Boom Installation 2 WD & 4 WD
Attach
8,9,10
7
Figure 3
Figure 1
Orange
Red
Figure 2
Approximate Lift pont
1
Section 9 - 2
Hoses
Boom
Blue
Yellow
Yellow
White
Head End Boom,
Hose Colors

Advertisement

loading

This manual is also suitable for:

John deere 6415John deere 6320John deere 6420Machete