Boom Hoses / Tank Hoses:
1.
Install Hose Fittings Through Frame. These
are 90 deg bulkhead fittings, there are 3 of them.
These will mount on the RH side in a plate with 3
large holes in it (See Figure 1). These holes are
stamped and some times the holes will need to
cleaned out.. Clean them with a burr grinder (See
Figure 1). Install the Bulkhead Elbows one at a time
starting at the top, tighten the retaining nut in each
Elbow as you install it (See Figure 2). Clean each
Elbow ID and Hose with clean compressed Air, put
the plastic caps back on the Elbows till Hose is
connected to it (See Figure 3).
2.
Pump Pressure and Return Hoses. Locate
the three # 16 (1") hoses. These hoses will have
plastic Ties on them at the fittings.
1 st
# 16 X 52" Long and will have a Red Tie on it
(Hose Part # 02968158). Pressure Hose
2 nd
. # 16 X 52" long and will have an Orange
Tie on it (Hose Part # 02968157). Tank
Return Hose
3 rd
# 16 X 48" long and have Blue Tie on it (Hose
Part # 02958647). Case Drain Hose Install
these hose in the correct order as shown,
this is critical that the do not get mixed. (See
Figure 4)
3.
Slide Sleeving over the Hoses run-
ning to theTank. The Sleeving is used to protect the
hoses from scrapping and being damaged. (See
Figure 5, 6,7)
Front Mounting
Pads
Figure 3
Machete (JD-62, 63, 6420 Asy Man) 10/04
© 2004 Alamo Group Inc.
Hose Installation 2 WD & 4 WD
Figure 1
Figure 2
Hoses To
Boom
Red
Orange
Blue
Figure 4
Section 8 - 2
Hose To Pump
& Tank
Red
Orange
Blue

Advertisement

loading

This manual is also suitable for:

John deere 6415John deere 6320John deere 6420Machete