Download Print this page

Alamo John Deere 6215 Assembly & Instruction Manual page 97

Advertisement

Hose Installation 2 WD & 4 WD
Boom Hoses / Tank Hoses:
1.
Install Hose To Pump and Tank. These
hoses go through a hose holder that is welded to the
front Rail support that is bolted to tractor frame Rail,
these hose must be run here before connecting
them to Pump and tank (See Figure 10). These are
the pressure and return hoses. The fitting on the
Tank will have plastic ties on them that match the
Plastic ties on the Hoses (See Figure 8 & 9).
Connect these hose to the correct colors, Red
Sleeving to
Pressure, Orange Tank Return from Motor and
Protedt Hoses.
Blue Tank Return from Bypass.
Figure 5
Figure 7
Figure 6
Figure 8
Orange Plastic Tie
Red Plastic Tie
Blue Plastic Tie
Figure 9
Machete (JD-62, 63, 6420 Asy Man) 10/04
Section 8 - 3
© 2004 Alamo Group Inc.

Advertisement

loading

This manual is also suitable for:

John deere 6415John deere 6320John deere 6420Machete