Frame Rail Installation 2 WD & 4 WD
Re-Install Frame Rails to Tractor:
5.
Install Axle Mounted Boom Rest. This will
require two people, one to align the Boom rest with
the Hoist and one to align the Bolt holes on the
bottom to start them into the Axle Housing. (See
Figure 5, 6 & 7)
When the Bolts are installed into the Frame
Rail & Boom Rest Plates and snugged up to Axle
housing, install the RH Axle Mounting Strap (See
Figure 8, 9 & 10). Do not tighten Bolts snug them
only for now.
Boom Rest
Plate
Boom Rest
Weldment
Front
Machete (JD-62, 63, 6420 Asy Man) 10/04
© 2004 Alamo Group Inc.
(continued)
Right
Cab
Rear
Side
Wheel
of
Side
of
Boom
Boom
Rest
Rest
Back
Figure 7
Figure 5
Figure 6
RH Axle Strap
Figure 8
Section 7 - 3
Boom Rest