Boom Installation / Boom Hoses:
8.
Connect hoses to Head. This will
vary with the type Head being installed. See the
Head Hose Connections for the head being used
in the Head Installation Steps in next pages.
9.
Hoses connected to Valve. Finish con-
necting Boom Cylinder Hoses to Front Valve if you
have not already done so, With these hoses you
shoud have them connected by color code Plastic
Tie on Pony.Connect the hoses from the Swing,
Lift, Dipper, Tilt & Door (See Figure 9). Figure 9
is shown without hoses or Pump installed to better
be able to see location of each connection is. All
the hose connections should be done now.
10.
Install front Pump Cover. Install front pump
cover which is hinged and held down with rubber
strap which will need to be installed (See Figure
10 & 11). The Parts Manual container installs on
the LH side of the Pump Cover (See Figure 11).
11.
Hose Rings. There are Hose rings welded
on to the front of the RH Frame Rail that Hoses
should be run through (See Figure 2), this hold
Hose up and in place, These rings should have
been install in an earlier Assembly Step and should
have had hoses run through them when hoses
were installed. Make sure none of the hoses are
going to scraped or damged by other components
(See Figure 4, 5 & 6).
Oil Temperature
Gauge
Figure 10
Machete (JD-62, 63, 6420 Asy Man) 10/04
© 2004 Alamo Group Inc.
Boom Installation 2 WD & 4 WD
(Continued)
Figure 8
Photo without Pump & Hoses
shown for illustration only
Door
Tilt
Dipper
Lift
Swing
FIGURE 9
Figure 11
Section 9 - 4