Download Print this page

Alamo John Deere 6215 Assembly & Instruction Manual page 91

Advertisement

Frame Rail Installation 2 WD & 4 WD
Counter Weight Installation:
1.
Counter Weight (CWT) Installation. The
Counter weight (See Figure 83) mounts on
the LH side Frame Rail with a Support Rod
running up to a Bracket that welds to the High
Frame. The Bolts must be installed as shown
with the Locknuts to the inside . Installing the
Bolts this way will make them easier to tighten
up (See Figure 28 & 30). Install both bolts as
shown (See Figure 28). Snug the Bolts, don't
tighten them yet.
2.
Level Counter Weight (CWT). Use a Floor
Jack to lsupport and level counter Weight after
Hinge Bolts have been installed (See Figure
31). Use a Framing Square to align the CWT
with the High frame (See Figure 32).
Counter
Weight
Bolts and
Nuts
Bracket
Figure 29
Figure 31
Machete (JD-62, 63, 6420 Asy Man) 10/04
© 2004 Alamo Group Inc.
Mounting
Bolt
LH Frame
Rail
Locknut
CWT
Mount
Tubes
Mounting
Bolt
Figure 28
LH
Frame
Rail
Front
Counter
Weight
Counter
Mounting
Weight
Bolt
Support
Strap
Figure 30
Figure 32
Section 7 - 9
Rear of
Tractor
1 2
1 2 1 2
1 2
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5
1 2
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5
1 2
1 2 1 2
1 2
Counter
Front of
Weight
Tractor
(CWT)
Non-Slip
Surface
Support
Rod
Weld
Notch
Counter
Weight

Advertisement

loading

This manual is also suitable for:

John deere 6415John deere 6320John deere 6420Machete