Chapter 2 Installing the GoQAM
Unpack and Inspect the GoQAM
Carrier's Responsibility
Cisco thoroughly inspects and carefully packs all products before shipment. The
carrier is responsible for safe shipping and delivery.
If there are any missing parts or if there is damage to the product contact Cisco
Services.
Retain all boxes for future equipment shipping needs. The boxes are specifically
designed for shipping the GoQAM.
Unpacking and Inspecting Procedure
Complete the following steps to unpack and inspect the modulator.
1
Review the Safety Precautions.
2
Inspect the shipping carton for visible damage.
3
Open the shipping carton.
Remove all packing material.
4
5
Inspect the product for visible damage.
6
Inspect for loose items that may indicate concealed damage.
Inspect for missing parts using the packing slip as a guide.
7
8
Go to Record the MAC Address (on page 19).
18
Error! No text of specified style in document.
Need help?
Do you have a question about the GoQAM and is the answer not in the manual?
Questions and answers