Installation Process Summary - Cisco GoQAM Installation And Operation Manual

Modulator rf output and if output hardware
Table of Contents

Advertisement

Chapter 2 Installing the GoQAM

Installation Process Summary

Before You Begin
This process assumes that you have already installed the GoQAM software on the
DNCS. Refer to the release notes and installation instructions for your GoQAM
release for detailed instructions. Also be sure that you have access to the Digital
Network Control System Online Help for your system release before installing the
GoQAM.
GoQAM Installation Processes
The following process summary provides the recommendations for a GoQAM
installation.
Stage
1
2
3
4
5
6
7
16
Process
Review system requirements and
technical specifications.
Consult your Bandwidth Management
Plan and the GoQAM input and
output specifications to allocate your
bandwidth resources properly.
Unpack and inspect the GoQAM.
Record the MAC address from the
label located on the underside of the
GoQAM unit.
Install the GoQAM into a rack.
Connect the GoQAM to an earth
ground and then the power source.
For the 120/230 V AC GoQAM,
connect the power cord.
For the 48V DC GoQAM, connect
the power wires to the DC power
inlet.
Connect other network devices to the
GoQAM, except the RF out ports.
See Procedure
N/A
N/A
Unpack and Inspect the GoQAM
(on page 18)
Record the MAC Address (on page
19)
Stacking Guidelines (on page 20)
Install the Modulator Into a Rack
(on page 24)
Connect Power Sources (on page
27)
Connect the DVB ASI Input Ports
(on page 29)
Connect the 10/100BaseT Ethernet
Port (on page 31)