Mitel sx-100 User Manual page 152

Superswitch volume iv (generic 217)
Hide thumbs Also See for sx-100:
Table of Contents

Advertisement

.
SECTION MITL91 OS/91 1 O-096-350-NA
Sheet 6 of 7
AT FRONT OF EQUIPMENT
(FIGURE
400-2)
Place equipment shelf and
power supply in position
Secure equipment shelf with
eight 5-16 in. retaining screws
and washers
Place the maintenance panel in
position
Secure with four 5-16 in.
retaining screws and washers
Secure cable with a new cable
tie
If the system was
wall-mounted, release clip on
strikes and allow it to swing
down
gently
P2, P3, P4,
Connect cables PI,
P18, P19, P20, 513, 514 and
J15 (Figure 400-4)
Connect 5302 (optional), the
maintenance
panel
connector
and the OOT cable (Figure
4 0 0 - 3 )
Plug power supply connector
into the back of the power
supply
(Figure
400-4)
Secure power supply connectors
with four retaining screws
Connect cable ground lug
Secure power cable with new
cable ties
Page D-8
: />'
-171
From (6)
A N D
INSTALL
EQUIPMENT
SHELF
A N D
INSTALL
INSTALL
MAINTENANCE
MAINTENANCE
PANEL
PANEL
A N D
CONNECT
CABLES
CABLES
POWER SUPPLY
RETAINING SCREWS (3)
CABLE SCREWS (4)
Figure
400-4
Power Supply Cable Harness

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sx-200

Table of Contents