NEC N8100-1220F User Manual page 411

Express5800/140re-4
Table of Contents

Advertisement

Hot Add
Take the following procedure to execute Hot Add:
1.
Pull out the server from the rack with the power being on.
2.
Remove the rear access cover.
3.
Locate the slot in which you are going to install an additional board.
NOTE:
are going to install the PCI board is off.
4.
Push the tab at the tip of the additional slot cover of the slot in which you are going to
install the PCI board to unlock the tab. Open the tab.
IMPORTANT:
Doing so could damage the tab.
5.
Remove the additional slot cover.
IMPORTANT:
Confirm that the PCI Slot Power lamp of the slot in which you
Do not open the retention tab to 90 degrees or more.
Keep the removed additional slot cover for future use.
Upgrading Your Server 9-37

Advertisement

Table of Contents
loading

Table of Contents