Ilm Opening Sequence; Ilm Lever Closing Sequence - Intel BX80619I73820 Design Manual

Core i7 extreme edition processor family for the lga2011-0 socket
Table of Contents

Advertisement

Independent Loading Mechanism (ILM)
Figure 4-5.

ILM Lever Closing Sequence

ILM lever closing sequence is shown in
1. Latch Active Lever first.
2. Close Hinge Lever second.
Note:
The ILM closing sequence is marked on the ILM load plate.
4.2.2

ILM Opening Sequence

For the opening sequence, the goal is to always open the hinge lever first to prevent
the loadplate from springing open. The only option is to release the hinge lever first.
The hinge lever in a closed position will block the active lever from being unlatched. By
opening hinge lever first, it creates clearance to open the active lever.
Thermal/Mechanical Specifications and Design Guide
Step 1
Close Active Lever
Figure
Step 2
Step 2
Close Hinge Lever
4-5.
31

Advertisement

Table of Contents
loading

This manual is also suitable for:

Core i7-3960xCore i7-3970xCore i7-3930kCore i7-3820

Table of Contents